Outdoor Patio Upgrade -Bricks, NJ

Project Information

The primary challenge faced during the outdoor patio upgrade was creating proper water drainage to prevent standing water and potential damage to the tiles in case of heavy rainfall.

  • CategoryOutdoor
  • ClientHorinda
  • Start Date01.03.2023
  • End Date07.03.2023
  • Websitewww.toptilenj.com/
  • Rating

Project Description

The primary challenge faced during the outdoor patio upgrade was creating proper water drainage to prevent standing water and potential damage to the tiles in case of heavy rainfall.

Challenges

There was poor drainage system in the location. If not resolved it can damage the tiles in the near future.

Solutions

Our tiling team implemented effective drainage solutions by carefully considering the patio's slope and installing suitable drainage systems, such as trench drains or strategically placed tile gaps. This ensured that excess water would flow away from the surface, preventing pooling and potential water damage. Additionally, the team used specially designed outdoor tile adhesives and sealants to enhance the tiles' water resistance and longevity in outdoor conditions.